Less Maintenance, Better Security, Insulation

Special-Lite doors

Special-Lite doors offered several benefits to the Union Grove School District, two of which were the saving of time and money.

As with most schools, maintenance and operating budgets at Union Grove School District, in Union Grove, WI. were spread pretty thin. Fortunately, Kurt Jorgensen, director of Operations & Facilities at Union Grove High School, found a way to save time and money, while at the same time improving security, by specifying Special-Lite FRP Doors.

The Union Grove district’s experience with SL-17 FRP Doors started with just one door, years ago. The hollow metal frame in that opening rusted away over time, but the door was still fine. Based on the performance of that door, Kurt convinced the school board to use Special-Lite FRP Doors instead of hollow metal doors, when all exterior doors were replaced in a renovation.

When Kurt learned that Special-Lite can locate proximity card readers inside an FRP door, protecting it from weather and tampering, he specified that option on nine of the new doors. As Kurt puts it, “that’s one less thing for kids to mess with.” Kurt also built in door position sensors so it is known whenever a door is opened, or has been propped open by a student.

After all exterior doors were replaced; Kurt says he could tell that the boilers were running less. On a cold December morning he noticed only one boiler was running, where before there would have been four running. According to Jorgenson, “I can tell by the temperature in the hallways, and teachers are saying that they are warmer. I’m turning down the temperature in their rooms. It is amazing.” Kurt attributes these changes to the replacement of the exterior doors with Special-Lite SL-17 FRP Doors.

When summing up his decision to insist on Special-Lite Doors, Kurt says, “I’m glad we did it. It’s one less headache. I know the doors are going to close every time.”

www.special-lite.com

This article originally appeared in the issue of .

Featured

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

Digital Edition