Ramtech Completes Installation of Modular Buildings at Tornado Damaged Van ISD

Ramtech has completed the work on four new modular buildings placed at the site of the temporary school campus established by the Van (TX) Independent School District in the wake of the damage incurred from the tornado that went through the city on May 10. The modular school buildings were configured as portable restrooms, and will be used by the district’s second and third grade students who will be relocated from the damaged J.E Rhodes elementary school to the temporary school site at the front section of property at Van Middle School. Working together with Eubanks Harris Roberts Craig Architects, each one of the 12′X 34′buildings were designed to include boys and girls restrooms with age-appropriate child height toilets.

Purchased through the Texas Association of School Board’s Buyboard purchasing co-op, the buildings have standard R-panel siding on the exterior and fiberglass reinforced plastic panels on the interior walls. Ramtech’s scope of work also included the installation of the decks, ramps, and landings. The EF3 tornado caused over $40 million in damage which included two of Van ISD’s schools, the administration building, and the maintenance and transportation centers. To be able to start school on time in August, the district received portable classroom buildings that were donated from the Tyler Independent School District. Tyler ISD’s current superintendent is Dr. Marty Crawford, who in 2013, led the West Independent School District through their rebuilding effort after the devastating fertilizer plant explosion in the city of West.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.