Why should we use orbital scrubbers?

Education facility managers and administrators struggle to balance limited operational budgets and a need to maintain clean and healthy schools for their students and faculty.

Subject to continuous foot traffic, floors become soiled quickly and that dirt is tracked throughout buildings. Soiled floors not only detract from the overall aesthetics of facilities, but slick dirt and grime can cause slip-and-fall hazards while dust and allergens adversely impact indoor air quality (IAQ). Numerous studies have identified poor IAQ as a key contributor to the development of asthma in young people and the spread of other illnesses among students and faculty. These illnesses lead to increased absenteeism, which is directly linked to poorer classroom performance.

Orbital scrubbers allow maintenance teams to maintain a high level of cleanliness with minimal chemical and water usage. By actively removing dirt and grime, as well as the chemical residue that attracts dirt, orbital scrubbers help maintenance staff to keep schools healthier. The introduction of orbital scrubbers has allowed schools to maximize operational resources and enhance the learning environment while continuing to achieve a high level of appearance that meets the expectations of students and staff.

While orbital scrubbers achieve a high level of performance for daily scrubbing, they also offer the flexibility to be used for deep scrubbing and chemical-free floor finish removal. Traditionally, the deep scrub and recoat process required many hours of labor, multiple machines and harsh chemicals. Orbital scrubbers allow this operation to be performed with water only — no chemicals — helping schools to enjoy significant budget savings while introducing fewer chemicals into their facilities.

This article originally appeared in the issue of .

About the Author

Scott Keller is a market manager for Nilfisk, Inc. (www.advance-us.com, www.clarkeus.com). He can be reached at 763/745-3824.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.