Why should we install destratification fans?

First, it’s important to understand what a destratification fan system will do. A destratification system is a grid of multiple ceiling fans working in concert to continuously mix the ceiling air to the floor and balance a facility’s air temperature.

When a space’s temperature is balanced, the need to over-heat or over-cool the space due to stratification is eliminated and significant savings can be realized.

Colleges and schools have indoor athletic facilities, large classrooms and lecture halls, libraries, storage facilities and other highatrium areas where destratification fans are effective and will reduce the energy used to condition the space.

There are many other benefits from a destratification fan system:

  • Improved comfort:
    Any facility has areas that are often too cold or too hot. Occupant comfort is improved with a quality destratification fan installation.
  • Safer work areas:
    A PHI (photohydroionization) kit can be installed in some destratification fans to eliminate molds, bacteria, VOCs and odors. Health conditions can be improved in kitchens, cafeterias, locker rooms, janitorial storage areas, etc.
  • Fits into tight spaces:
    An enclosed destratification fan, unlike paddle or HVLS (high-volume, low-speed) fans, can fit tightly into a ceiling with rafters, ducts or other truss structure.
  • Helps swimmers:
    In indoor swimming facilities, destratification fans can remove the layer of chloramines just above a pool’s surface, which often irritates swimmers.
  • Longer life for lighting systems:
    Decreasing ceiling temperatures extends the life of the lighting system.

This article originally appeared in the issue of .

About the Author

Christian Avedon is sales and marketing director for Airius (www.airiusfans.com), a Longmont, CO, manufacturer of destratification fans.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.