University of California, Santa Barbara: Davidson Library

University of California, Santa Barbara: Davidson Library interior and exterior images

PHOTOS © LERUM PHOTO

The $58.5 million renovation of the Davidson Library at University of California, Santa Barbara (UCSB) is designed to enhance teaching, learning and research at UCSB, meeting the needs of the campus’ growing student body. Constructed by C.W. Driver, various renovations including Fire and Life Safety upgrades and seismic retrofits were made in order to bring the existing library up to code while also incorporating a range of collaboration spaces, a café and numerous open-air study areas. C.W. Driver worked closely with the university and library staff throughout the entire project to lessen the impact of construction to students and staff, working around the university’s schedule.

Designed by Pfeiffer Partners, the renovations included the addition of a 62,000-square-foot, three-story building to the north of the library, which houses the Special Research Collections, a collection of rare artifacts and materials available to UCSB students, faculty and the scholarly community. Due to the historic contents, the space requires very tight humidity and temperature controls which are regulated by dedicated HVAC units and a large desiccant wheel dehumidifier. A cold room, designed to imitate a walk-in refrigerator, and a vault area were installed for the most sensitive and valuable items.

Davidson Library achieved LEED Gold certification and joins approximately 24 LEED-certified buildings already at UCSB. To achieve this distinction, C.W. Driver incorporated a number of aspects to optimize energy efficiency, improve indoor environmental quality and maximize the use and reuse of sustainable and local resources. Additionally, UCSB’s Davidson Library was one of the first Construction Manager at Risk (CMAR) projects — a delivery method where the construction manager is committed to delivering the project within a guaranteed maximum price — to be utilized within the University of California system.

Despite labor shortages in the region throughout the duration of the project, UCSB’s Davidson Library was completed on-budget, four months ahead of schedule.

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition