Better Classroom Security for Safer Schools

CLassroom Security

Olathe Public School District made their schools safer and more secure by replacing multiple brands of locks on classroom doors with Schlage locks and the Everest 29 key system.

The Olathe Public School District in Kansas is improving classroom security and simplifying key control by replacing multiple brands of locks on classrooms doors with Schlage locks and the patent-protected Everest 29™ key system.

With 40+ schools, the school district was using key systems from three different manufacturers, making key control difficult.

Challenges included:

  • Limited support and expansion: manufacturers no longer supported some systems, while others had reached their capacity.
  • Overexposure: Some of the key systems had been in place so long that it was difficult or impossible to know who had keys.
  • Maintenance: Upkeep was also troublesome with so many key systems to maintain.

The district wanted to implement door hardware products and a consistent key system across the district that allowed for increased control and more effective maintenance.

The school district chose Schlage mortise and cylindrical lock products and a patent-protected Everest 29 key system because of its many benefits, including:

  • Patent protection: The key system provides patent protection against unauthorized duplication through 2029, so the district will be able to maintain effective key control with confidence.
  • Ease of rekeying: All locks are Schlage with full-size interchangeable cores, which simplify rekeying.
  • Classroom security functionality: The Schlage L-Series mortise locks and ND-Series cylindrical locks used include a classroom function that allows teachers to lock the door from within the classroom during an incident.

Most of the locks being upgraded are on classroom doors, the district also is replacing locks on other openings.

www.allegion.com

This article originally appeared in the issue of .

Featured

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.