Storage made Easier with LEVPRO

storage

Cambridge Elementary was able to organize their storage spaces and free up space by utilizing the new LEVPRO system.

Cambridge Elementary in Cambridge, Wis., recently installed a LEVPRO system to revamp previously cramped and cluttered storage areas. Before LEVPRO, the school’s staff was consistently frustrated because it took them a long time to find equipment and put it away properly. With LEVPRO, teachers moved all frequently used items into the units by the gym and got rid of their rundown, homemade shelving. By adding capacity and storing similar items together, staff now can quickly and easily find what they need. And, cleaning under the shelving and returning items after class is a breeze.

Says Anneke Legge, physical education teacher. “With LEVPRO, finding and storing equipment is seamless, allowing our staff to spend more time planning and preparing for class, and less time hunting down equipment and supplies. The extra capacity in the new system also created space for new inflatable kayaks for our pool, and we still have some extra space for new gear.”

Available now, the new LEVPRO line will be manufactured in Spacesaver’s Fort Atkinson, Wis.-based manufacturing facility. It can be purchased online and bought in partnership with Spacesaver’s network of independent distributors who work with customers through every step of the design and installation process.

“Spacesaver is always looking for new ways to help customers creatively tackle their storage needs,” says Spacesaver CEO Mark Haubenschild. “Saving time, increasing productivity and doing more with the space they have are essential for our K-12 educational customers.”

www.spacesaver.com

This article originally appeared in the School Planning & Management January 2018 issue of Spaces4Learning.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.