How can we move to network-based communication?

Many schools rightly see network-based distributed communication—moving paging, intercom, and bells to the LAN away from separate hard-wired analog systems—as a way to increase efficiency, flexibility, safety, and even space. Replacing huge paging amps, redundant wiring, and 70-volt speakers with a server, a software interface, and a variety of flexible IP-addressable endpoints has numerous advantages. The most basic include giving office staff the power to set up different bell schedules for different zones, turn them off on the weekend, and make changes anytime with a few clicks.

Schools can also gain safety functionality they never had before: panic buttons in classrooms, silent alerts, and instant triggering of lockdowns and all-clears from the office or even a mobile device. Integrating all these methods of communication under a single platform is a big plus.

But it’s not an impulse buy. The time to move to a modern school communication platform isn’t when your current analog amp goes down. This takes planning—and not just at the individual school level.

Most districts want standardization throughout their schools. Clearly, continuing to standardize on 1960s technology is not acceptable, but making a sweeping district-wide upgrade to IP-based systems is daunting. A more realistic approach is to build the new digital standard into new construction projects, then bring older schools up to that IP-based standard over time. This ensures you’re designing for the future rather than digitizing old habits and forces a district-wide approach to daily communications and safety protocols you can implement methodically over a number of years.

It’s a big task, but very worthwhile, and fortunately there are experienced professionals to help you execute a successful plan.

This article originally appeared in the School Planning & Management April 2018 issue of Spaces4Learning.

About the Author

Jaime Mendez serves as architectural consultant at FrontRow. He can be reached at [email protected].

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.