Wisconsin Middle School Undergoes Renovation and Expansion

Miron Construction Co., Inc., in partnership with Plunkett Raysich Architects, LLP, began construction to renovate and expand the Wisconsin Rapids Area Middle School in Wisconsin Rapids, Wisc .

Rapids Area Middle School

Miron’s scope of work on the $7.1 million project includes building a 31,500-square-foot addition for 14 new classrooms, new restrooms, a conference room, four new offices, a gymnasium, and gym storage, as well as a new mechanical mezzanine. The renovation also includes expanding the cafeteria and modifications to the existing locker room.

Work on the project began in October 2017 and is scheduled to be complete in August 2018.

Featured

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • UNH Marks Construction Milestone on Oceanic Exploration Facility

    The University of New Hampshire in Durham, N.H., recently celebrated a major construction milestone with a beam-signing ceremony for the new Center of Excellence for Operational Ocean and Great Lakes Mapping, according to a news release. The facility’s ultimate goal is to support research, training and technical assistance in ocean mapping.