Ensuring a Safe School Environment

Cyberlock

Cyberlock served as a cost-effective way for The Southhampton School District to reduce the number of keys shared, and bring a new sense of safety and security to school life.

Southampton School District (SHSD) is nestled in the beach village of Southampton, New York. As part of the summer colony known as The Hamptons, it has a mix of middle-income neighborhoods, rural farms, and an affluent estate section. The village is anchored by the elementary, middle, and high schools which are at the very center of community activity.

Over the years SHSD had lost control of their mechanical master/sub-master key system. Problems associated with key-sharing were worrisome and there was constant concern about lost keys being used by unauthorized people. SHSD began searching for a solution that would circumvent lost key issues and give them more control at the door.

Randy Dobler, SHSD director of Facilities & Operations, says, “A number of manufacturers showed us their products. It was sheer luck that I stumbled upon a CyberLock ad in a trade magazine. We immediately saw CyberLock as a cost-effective alternative to what we had in place. Not only could we expand the system as needed but we could retrofit the locks in all our doors without hardwiring. We contacted other schools that were using CyberLock and received positive feedback.”

After a trial installation at SHSD offices they proceeded to install 221 CyberLock electronic cylinders in the elementary and middle schools and issued 249 smart keys to teachers and staff. Steve Phillips, SHSD maintenance supervisor, shares, “I’ve been very impressed with the ease of installation. It only takes three minutes to retrofit a lock with the CyberLock eCylinder. We are currently expanding the CyberLock system to the high school.

Dobler concludes, “Prior to CyberLock, we felt like everyone in town had keys to our schools. Now, each teacher and staff member carries their own smart key that is programmed to access that person’s workspaces. The key is valuable to staff so key sharing has ceased.

www.cyberlock.com

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.