Zoned Technology Leads to Lower Electric Bills

Misubishi

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

After many years running on an outdated boiler system and noisy AC units, St. Joseph School, in Pilot Grove, Mo., needed to find an HVAC system that could efficiently cool and heat the 5,400-square-foot building without disrupting day-to-day activities. The solution: Zoned Comfort Solutions from Mitsubishi Electric Cooling & Heating.

With these needs in mind, the school worked with Jamie Callahan of Air and Water Solutions. Callahan believed there was only one solution for St. Joseph’s—zoned technology, and he recommended Zoned Comfort Solutions from Mitsubishi Electric as the brand for the school to install. He said, “The school didn’t want to reuse the gas boiler, and with the energy efficiency of Mitsubishi Electric units, it was the only option.”

The installation took only two weeks and Callahan has received nothing but positive feedback from the school, specifically with the system’s ability to offer cost savings. He said, “From what I’ve heard, the school went from paying thousand dollar electric bills to paying $245 a month. That’s nearly 25 percent of the original cost.”

The staff agrees that the experience has been great. Principal Nichole Watring said, “We have not had any issues with the system and the teachers and students love that they can control the temperature of their rooms. It’s much quieter and more efficient than the previous system.”

The school was also pleased with the system’s appearance. School Manager Donna Gerke said, “We looked for a system that offered more cost savings and efficiency but aesthetics was an added bonus. It’s given the school a whole new look on the inside. It looks fresher and cleaner.”

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

www.mitsubishicomfort.com

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.