East Baton Rouge Career and Technical Education Center Under Construction

A new Career and Technical Education Center (CTEC) is under construction in East Baton Rouge Parish (EBR), La. The new facility will be a modern addition to the district in East Baton Rouge, and will be built to display an industrial look that mirrors some of the disciplines studied within. The design allows for future additions and changes as dictated by the changing labor market.

East Baton Rouge CTEC

The new school is being built to promote education for many in-demand, high wage fields. EBR CTEC hopes to address a shortage of qualified candidates for many technical jobs in the region. The school, which plans to open this coming August, currently has 133 students enrolled.

Featured

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.