New Pre-K Center 613 Completed in Brooklyn

Pre-K Center 613 is a new three-story school in a dense urban block surrounded by residential buildings, developed by the New York City School Construction Authority and designed by MDSzerbaty Associates Architecture as part of the NYC Mayor’s “Pre-K-For-All” initiative.

Pre-K Center

The school provides 14 classrooms for 252 students and includes an indoor play room, administration offices, and a clerestory-lit multi-purpose room at the cellar level. To shorten the construction duration, a reinforced concrete frame with architectural insulated precast wall panels were chosen for their ability to be rapidly constructed and erected.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.