Leadership Center Project at Dunn School Scheduled to Open Late 2019

Earlier this year, Allen Construction began work on a new 6,121-square-foot, state-of-the-art, leadership center at Dunn School in Los Olivos, Calif. Once completed, the Cindy Bronfman Leadership Center will be a multi-purpose facility that serves as the hub of whole-student education and leadership at Dunn School.

DUNN School

The new center will feature:

  • Flexible spaces for modern teaching and learning
  • An Innovation Lab for student collaboration
  • The Earwig Café, a student-run snack bar that teaches business and entrepreneurship
  • New College Counseling Center
  • Large Alumni Hall for all-school meetings and presentations
  • Student loft for quiet study and retreat
  • Outdoor balcony with a view of the Santa Ynez Mountains
  • Generous shaded spaces outdoors for reflection and relaxation

The building is designed based on a “first principles” approach by taking full advantage of natural phenomena to achieve energy efficiency. The building will have three large wind chimneys to capture and funnel hot air out the top of the building. The floors will be exposed concrete, which will help cool the building naturally during warmer months, and large bay doors can be opened to allow the Valley breezes to cool the building even further.

“We are excited to be part of this great project for Dunn School,” said Eric Johnson, Regional Director for Allen Construction. “The building’s design falls in line with our philosophy of green building and sustainability.”

The facility is expected to be completed by late 2019. For updates on the project, please visit dunnschool.org.

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

Digital Edition