High School District to Pump $600k into Smarter Surveillance System

The board of a California school system has approved funding to replace legacy security camera gear. West Sonoma County Union High School District awarded the $602,948 contract to Integrated Security Controls, a regional solution provider.

According to local reporting, the Santa Rosa company will be installing 96 cameras at three high schools, Analy, El Molino and Laguna, as well as software with analytics that will enable administrators to view what's happening at their schools.

During the meeting where the approval was given, facilities manager Jennie Bruneman told the board that the previous camera system was "very difficult to use," forcing users to manually look through footage to find what they needed. With the new equipment, users will be able to search on specific details — "a student wearing a ball cap and a red shirt" — and the analytics will identify that individual as he or she moves around the campus.

The Integrated Security solution was chosen after a pilot project that tested two companies' systems. The specific equipment being installed comes from Avigilon, a Motorola Solutions company.

The camera installation is expected to be done by the end of September, Bruneman told the board.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.