Madison SD Installs Electronic Door Locks, Internet-Based Phones to Enhance Safety

Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.

The $6.5 million security plan was partially funded by a grant program the Wisconsin state government established last year in a response to a mass shooting at a Florida High school. Madison was awarded $1 million in the first round of funding and $1.5 million in the second round. The rest of the plan was covered by local funds.

More than 4,600 locks have been swapped out across the district. The electronic locks — which are controlled by staff ID badges — automatically locks people from coming in a room once the door is closed, unless they have a badge.

About 4,100 new phones have been put in all schools but the software that increases the phone’s capabilities will be installed throughout the fall semester. Once added, the phones will be able to page an individual classroom through the PA system and send out emergency notifications to families.

“This new phone system gives us a ton of flexibility and functionality because it is run over the internet,” director of building services, Chad Wiese told a local newspaper.

In addition, the school district is adding more than 400 cameras and window-hardening film to main entrances of schools, designed to slow down active shooters.

In order to receive the grant funding from the state, teachers needed to complete associated safety training. The district also trained staff and teachers on new standardized emergency response procedures.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition