Santa Maria-Bonita Elementary Celebrates Construction Milestone

Santa Maria-Bonita School District celebrated a major construction milestone of its newest elementary school on Sept. 26. The California school district celebrated the project’s topping out by signing the final beam before it was lifted and installed at the top of the structure.

The two-story, $51 million school was designed by DLR Group and constructed by AMG & Associates. When completed in August 2020, it’s expected to accommodate up to 900 students in transitional kindergarten through sixth grade.

The 66,000 square-foot campus will feature 26 classrooms, a space for students enrolled in the district’s Therapeutic Learning Program, administrative offices, a multipurpose cafeteria/auditorium and play-fields.

"This is a unique design," Superintendent Luke Ontiveros told a local news station. "It really is built around 21st century skills, collaboration, communication, creativity. There's some learning areas outside of the traditional classrooms that we'll be able to maximize and take advantage. Besides the two-story design, it's really that programmatic piece that we'll be able to implement that really is going to make a difference in the futures of our children."

 The 66,000 square-foot campus will feature 26 classrooms, a space for students enrolled in the district’s Therapeutic Learning Program, administrative offices, a multipurpose cafeteria/auditorium and play-fields.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.