Schools Give Water Fountains the Touchless Treatment

Alongside investments in personal protective equipment, sanitation stations and distancing shields, some schools are earmarking a portion of their federal CARES Act funding to replace their water fountains with touchless versions that don't need continual cleaning.

According to FloWater, one company that makes refill stations, business is gushing. In the past year, CARES Act funds have been used to install "hundreds" of “touchless” refill stations. Just a few of the installation sites include California's Colton Joint Unified School District, the Cherry Creek School District in Colorado, the Minersville Area School District in Pennsylvania and the Z.E.C.A. School of Arts and Technology in North Carolina.

Touchless variations of traditional water fountains may use foot pedals or sensors for operation. All require students to use their own containers.

Touchless water fountain
A touchless refill station replaces the standard school water fountain.
Source: FloWater

The company stated that more than 750 of its refill stations have been installed in schools, including 400 with the touchless technology. The refill stations are free-standing and connect to any potable water line within 100 feet. According to the company, most facilities can replace old fountains in the same location without having to obtain building permits or do additional construction.

"This is a 'win' on so many levels for our school community," noted Frank Miranda, superintendent at Colton, in a press release. "We have provided clean drinking water, met the pandemic-driven safety challenge for a safe reopening and provided easy access to the healthiest drink possible."

"Before COVID, we were seeing a high demand as schools looked to eliminate plastic waste and contaminants, like lead, from their drinking water," added FloWater CEO Rich Razgaitis in a press release. "Now, with our fully touchless drinking water solution, we are able to meet the national challenge to replace outdated water fountains."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.