NY School Sees AV Equipment Overhaul

An upstate New York public school recently saw a major upgrade to its AV capabilities through a partnership with Ashly Audio and Advance Sound Company. Stissing Mountain Junior/Senior High School of the Pine Plains Central School District in Pine Plains, N.Y., updated its suite of audio amplification and control solutions to serve not just the school’s students and faculty, but the wider community. In the small town of about 2,500, the local junior/high school serves as an educational facility, a community meeting space, and a live performance venue.

“When you have a space that is truly the preeminent meeting and performance hall for a community, your primary concerns need to be that the system works well and is extremely intuitive to control,” said Thomas DePace of Advance Sound Company, which installed the equipment. “What we found in Ashly Audio was a system that confidently checks those boxes and brings with it a ton of flexibility.”

Advance Sound Company integrated the following products into the school space:

  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor providing 12 inputs and 12 outputs
  • Ashly NE24.24M with a Protea DSP Audio Matrix Processor with four inputs and four outputs
  • Ashly NXE1.52 Network Power Amplifier providing two channels, each delivering 1,500 watts at 2 ohms
  • Ashly NXE8004 network amplifier delivering four channels, each providing 800 watts at 2 ohms
  • Ashly NE8800MM network-enabled Protea DSP with eight inputs, eight outputs, and 2 four-channel mic cards

“We’re using that full array of Ashly amplification to power multiple Danley speakers throughout the facility,” explained DePace. “Everything from larger speakers across the main auditorium to monitors and stage fills. The Ashly setup also has a very nice way in which it allows for mixing the system.”

DePace also commented that, for the system’s complexity, the setup remained intuitive and easy-to-use. “We were able to set it up so perfectly that I have no doubt that when the principal or the custodian need to use the system, it will be very easy for them to do so,” he said. “When your customer is a small or medium-sized organization, having that confidence is a huge benefit.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.