Mass. Town Breaks Ground on $60M Elementary

Groundbreaking has taken place on a new elementary school in Amesbury, Mass. Construction of the Sgt. Jordan Shay Memorial Lower Elementary School was approved by city residents in 2019. The $60-million facility will sit next to the Cashman Elementary School, creating a two-building campus where students in preK–2 will attend the new school and students in grades 3–5 will attend Cashman.

The school is intended to use green design principles, with a projected savings of 28% in site energy use and 35% in reduced water use.

Project management is being handled by NV5. DiNisco Design is serving as architect for the building. The construction contract was awarded to CTA-Construction Managers. Civil engineering is being done by DGT Associates. And Brown + Sardina was named landscape architect. All are Massachusetts-based companies.

Sgt. Jordan Shay Memorial Lower Elementary School

The facility is being named after Jordan Shay, who grew up in Amesbury and died in Iraq during his second deployment. According to a foundation that was formed under his name, Shay specified in a "just in case letter" that if something were to happen to him, he wanted a scholarship fund to be started for students who "want to make a difference in the world." The foundation is led by Shay's mother, Holly.

Construction is expected to be done in March 2023.

Amesbury has posted all documents related to the project on a city website.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.