Austin Area Debuts New Elementary School

The Luling Independent School District in Luling, Texas—part of the Austin metropolitan area—recently celebrated a ribbon-cutting ceremony for its newest facility. Shanklin Elementary School came as a result of a bond program passed by voters in May 2019 to upgrade and replace five district facilities in poor condition. The two-story facility cost $23.6 million and measures in at 86,000 square feet.

“The new Shanklin Elementary continues the tradition of excellence so many generations of Luling ISD students have experienced,” said Erin Warren, Luling ISD Superintendent. “The district is excited to welcome our community to see firsthand the extraordinary instructional opportunities in place for future generations of students.”

Shanklin Elementary School
Photo courtesy of Lockwood, Andrews & Newnam, Inc. (LAN)

The new facility will replace two existing schools, Luling Primary and Leonard Shanklin Elementary Schools, and consolidate their students, faculty and staff into a single campus. The move will allow the district to divert maintenance and operations funds for Luling Primary School to other purposes.

Amenities in the new school include 42 new classrooms, two playgrounds, a gymnasium, a media center, a cafeteria and kitchen, and an administrative suite, according to a news release. It has also integrated a variety of life-safety and security enhancement measures to keep students safe.

“The new elementary school will meet Luling ISD’s needs for the next 50 years and provide students the infrastructure needed to succeed in the 21st century,” said JP Grom, AIA, vice president of Lockwood, Andrews & Newnam, Inc. (LAN), which managed the bond program. “In addition to providing a safe environment for students, the facility will also be used by the community for various purposes.”

The school district partnered with Claycomb Associates, Architects for design and Weaver & Jacobs Constructors, Inc. for construction.

The Luling 2019 bond program totaled $31.9 million, and it also included renovations at Gilbert Gerdes Junior High School and converting an existing elementary school into a staff and visitor parking lot.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.