Sharp NEC Display Solutions Debuts New LCD Laser Projectors

Sharp NEC Display Solutions, which provides projectors and displays to a worldwide market, recently announced the addition of two new LCD laser projectors to its PE Series. The PE506UL and PE506WL were designed for use in K–12, higher education and corporate spaces and provide high-resolution images at a brightness of 5,200 lumens, according to a news release.

Sharp NEC Display Solutions PE506UL
The Sharp NEC Display Solutions PE506UL

“To meet the ever-changing needs of our customers, we’ve upgraded our PE Series entry-installation laser projector lineup with brighter, more flexible solutions for projector replacements or new installations. The upgraded PE Series projectors are among the smallest and lightest 5,000-lumen projectors in the market and include advanced features ideal for socially distanced classrooms, large lecture halls or even corporate environments,” said Ryan Pitterle, Product Manager, Sharp NEC Display Solutions. “The PE506UL and PE506WL are perfect for the cost-conscious customer looking to make the lamp-to-laser transition.”

The news release states that the PE506UL offers WUXGA 1920x1200 resolution and the PE506WL offers WXGA 1280x800 resolution. The light source offers a minimum of 20,000 hours of life to reduce both maintenance requirements and total cost of ownership. The LCD technology offers clear and dynamic images, bright colors, and both manual horizontal and vertical lens shift for ease of installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.