Maine High School Starts Construction on $4.3M Athletic Complex

Kennebunk High School in Kennebunk, Maine, recently began work on a new $4.3-million athletic complex. Local news reports that voters approved a portion of the funding for the new project in May and approved the district’s overall operating budget in June. RSU 21 School Board Chair Art LeBlanc called the project “very exciting and long overdue,” as the existing athletic complex has fallen into disrepair in recent years.

During a presentation earlier this year, LeBlanc outlined some of the problems with the current facilities. The track was built in 2004 and is cracked and filled with holes. The bleachers were built in 2006, are not structurally sound and are not ADA-compliant. The 1980s-era lights are outdated, and poles have been damaged by wildlife. Finally, the field has drainage issues and is currently unusable for competition.

According to local news, the new complex will feature synthetic turf to support the school’s football, soccer, lacrosse and field-hockey teams. The turf is made of virgin EPDM material and is free of PSA toxins, as well as the contaminants usually associated with recycled rubber.

New home-side bleachers will cost $258,000, while another portable set will cost $170,000. A new press box will cost $212,000, the new lighting system $368,000, and track upgrades $125,000. Funding for the project is coming from $2.8 million from the district’s capital reserve fund, as well as $1.2 million left over from a previous construction project and another $250,000 previously allocated for track repairs.

The district partnered with CHA Consulting, Inc. to design and engineer the complex’s renovations in participation with local firms Sebago Technics and S.W. Cole. Further details about the project are available on the Maine Regional School Unit 21 website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition