D.C. Elementary School Achieves Double Platinum Certification

John Lewis Elementary School in Washington, D.C., recently became the first school in the award to be awarded both WELL and LEED certifications at the platinum level, according to a news release. As part of a three-step sustainability approach, the school is also aiming to become the first school in D.C. to achieve Net Zero Energy (NZE). The facility was designed by architecture and design firm Perkins Eastman DC.

The news release reports that the facility was designed to emphasize civic presence, community connectivity, the student experience, and student wellness.

“From the very beginning, the district wanted this project to establish a new benchmark for our ongoing investment in school facilities, with the aim of enhancing community sustainability and resilience—and fostering health and well-being among the students and teachers who use the building every day. Achieving ‘Double Platinum’ at John Lewis Elementary School celebrates the collaborative commitment involved in realizing this inspiring vision that will enable DC’s students and communities to thrive,” said Sean O’Donnell, FAIA, Perkins Eastman DC’s K12 Practice leader.

The WELL Platinum distinction came through the International WELL Building Institute’s (IWBI) WELL Building Standard. The LEED v4 Platinum distinction was awarded in March 2024 via the U.S. Green Buildings Council’s LEED for Building Design and Construction: School rating, according to the news release.

“DC Public Schools is dedicated to providing sustainable learning environments in which the district’s students can thrive,” said Shilpa Khatri, Deputy Chief of DCPS Facilities & School Planning. “In partnership with PEDC and DGS, we are excited that we were able to leverage John Lewis Elementary School’s unique site conditions and new construction opportunities to pilot a robust model of WELL certification, Net Zero design, and LEED certification. Our planning and design experience embodies ‘building as pedagogy,’ truly emphasizing the educational value in facilities and ensuring paths for long-term maintenance and durability,” said Khatri.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • MiEN Releases White Paper on Community College Space Innovation

    MiEN Company recently released a new white paper called “Designing New Innovative Spaces for Community Colleges” to address the needs of community colleges post-pandemic, according to a news release. The eight-page guide by Dr. Christina Counts, MiEN Company VP of Education and Marketing, covers topics like the enrollment drop that these schools have seen since COVID-19, the roles they play in higher education and local workforces, and five suggested key changes that can improve students’ experiences.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.