Minnesota K–12 District Completes New Elementary School

Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release. The district partnered with Kraus-Anderson Duluth for the project’s construction and BNDRY Studio for its design.

The project was part of a larger construction initiative after consolidating the Eveleth-Gilbert and Virginia school districts into Rock Ridge, the news release reports. The 79,000-square-foot facility stands three stories and takes the place of a former elementary and high school. Amenities include collaborative learning spaces, open-concept classrooms, and modernized technology and teaching resources.

The building’s second floor features an outdoor learning space via an open-air learning patio above the main commons area. Extending the building upward to minimize the building’s footprint and reclaim greenspace was the result of collaboration with the surrounding community. Construction began in spring 2022, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.