University of Kentucky Sees Positive Results from Energy Efficiency Program

The University of Kentucky in Lexington, Ky., recently announced the results of its Energy Program in Facilities Management, put into place eight years ago, according to a news release. Between the fiscal years of 2017 and 2025, the university’s campus grew by 13.6% while the energy use per square foot dropped by 19.2%. The difference has saved the university a cumulative $85.5 million in energy costs, including $52.9 million for education & general operations.

“The success of the Energy Program reflects the university’s long-standing commitment to sustainability and operational excellence,” said Mary Vosevich, vice president for Facilities Management and chief facilities officer. “The Energy Program has empowered us to approach energy management strategically by reducing consumption, boosting efficiency and making smart reinvestments that benefit the entire UK community. We’re proud of the progress and excited to build on it.”

The Energy Program’s financial outcomes include an investment of $10.8 million in utility infrastructure improvement projects over $100,000; $8.2 million in fund balances back to the university; $15.4 million covered in un- or underfunded new square footage; and a strengthened budget against rising costs of labor, chemicals, and utilities, the news release reports.

According to the university website, the program began in 2016 as a partnership with energy conservation and sustainability company Cenergistic. The program’s ultimate goal is to reduce campus energy consumption by 20%.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.