i-PRO, NovoTrax Partner for New School Emergency Response Solution

i-PRO Americas, Inc., which manufactures edge computing cameras, recently announced a partnership with NovoTrax, provider of end-to-end life safety and mass notification solutions, to address gaps in emergency response workflows at K–12 schools, according to a news release. The combination of the two technologies—video protection systems and a unified life safety platform—is intended to streamline integration between video security and mass notification systems.

During emergency situations on school property, workflows can sometimes require school officials and first responders to manually navigate through separate systems to access video feeds or send alerts. According to the news release, the partnership’s goal is to be able to provide live video, real-time location information, and integrated communication to form actionable intelligence within seconds of the initial alert.

“Disconnected systems and fragmented workflows create real safety risks for schools,” said NovoTrax President Dave Gleason. “We’re proud to partner with i-PRO—an organization that shares our focus on quality—to close those gaps, accelerate emergency response, and strengthen the tools available to keep our schools safe.”

The NovoTrax EduTrax platform offers seamless systems integration and mass notification capabilities that unify separate school safety technologies. The partnership aligns with i-PRO’s open technology mindset, which prioritizes delivering flexible and scalable technology.

“School districts need trusted partners who can solve real integration problems, not just adding more systems,” said Masami Eguchi, President, i-PRO Americas. “By combining i-PRO’s mission-critical video capabilities with NovoTrax’s expertise in intelligent mass notification, we will enable educators and first responders to close critical gaps in emergency response workflows.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

Digital Edition