University of West Florida Opens New Laboratory Facility

The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program. It features three new wet and dry labs for civil engineering and construction management students to become familiar with construction materials.

Amenities include the trade demonstration area, also called the construction yard, for project-based learning. It provides space for practical demonstrations and applications of masonry, carpentry, and welding. The soils lab was designed for research and experiments regarding soil and concrete mechanics.

“The upgraded facility reflects the University’s commitment to academic innovation and preparing graduates to meet regional and national workforce needs in design, construction and sustainability,” said Dr. Mohamed Khabou, dean of the Hal Marcus College of Science and Engineering. “Both the civil engineering and the construction management programs will produce highly qualified graduates to fill high paying jobs in the local economy.”

The renovation cost a total of $1.5 million, and funding came largely from a “handful of generous major donors.” The building was named after Tyler Chase Norwood, a 2015 graduate of UWF. Complementing the new facility, the Tyler Chase Norwood Construction Management Scholarship Endowment received a gift of $250,000 to expand educational opportunities for incoming students, the news release reports.

The building will open its doors to students for the fall 2025 semester.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota District Partners with Kraus-Anderson on Four Construction Projects

    Stillwater Area Schools in Lake Elmo, Minn., recently announced a partnership with Kraus-Anderson for construction projects at four schools in the district, according to a news release. The projects’ funding comes from a $175-million referendum passed in November 2023.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

Digital Edition