Direct-Attach Ceiling Panels Improve Acoustics

Armstrong Tectum Direct-Attach acoustical panels

Armstrong’s Tectum Direct-Attach acoustical panels cut down on excessive reverberation times in Temple University’s School of Architecture.

The acoustics in Temple University’s School of Architecture building in Philadelphia were exhibiting excessively high reverberation times, affecting students’ ability to hear and understand their instructors. Acoustical testing by Metropolitan Acoustics of Philadelphia confirmed that reverberation times were much longer than recommended.

Consultant Graham Everhart explains how his team created models based off the testing to develop solutions. “Our overall recommendation was to incorporate acoustically absorptive materials on the available surfaces,” he states, “and in most spaces, the most available surface was the ceiling, so we focused on that.”

The consultants then worked with NELSON, the architectural firm responsible for the remedial retrofit project. “Considering the amount of hard surfaces, from an open metal deck to drywall walls to concrete floors, it was easy to see why sound bounced around so quickly,” notes Scott Winger, AIA, technical director for NELSON.

To reduce reverberation time and improve speech intelligibility, the design team chose Optima Capz ceiling panels from Armstrong Ceiling Solutions for the lecture halls and other presentation spaces. The panels were installed directly to the deck.

Tectum Direct-Attach acoustical panels from Armstrong were chosen for the classrooms and studios. “Tectum and Capz panels perform in a similar manner acoustically, but we went with the Tectum panels here because we thought they were a little more rugged and better suited for these types of spaces,” Winger states. These panels were also installed directly to the deck.

Acoustical testing following installation of the ceiling panels validated the choice of treatments. Reverberation time dropped an average of 56 percent in the eight spaces that were tested, including a 79 percent drop in one of the classrooms and a 64 percent drop in one of the studios.

www.armstrongceilings.com

This article originally appeared in the College Planning & Management January/February 2019 issue of Spaces4Learning.

Featured

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • University of Washington Opens New Broadcast Studio

    The University of Washington in Seattle, Wash., recently announced the opening of Sundodger Studios, a new broadcast, production, and content facility, according to a news release. The university partnered with Anthony James Partners for the design and development of the studio, which will host about 100 live broadcasts and 120 live videoboard shows per year.