Blue Ridge Elementary School

Project Information

Facility Use: Elementary School
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Blue Ridge, TX
District/Inst.: Blue Ridge ISD
Chief Administrator: Matt Kimball, Supt. of Schools
Completion Date: July 2021
Gross Area: 73,000 sq. ft.
Area Per Student: 146 sq. ft.
Site Size: 9 acres
Current Enrollment: 470 students
Capacity: 700 students
Cost per Student: $31,185
Cost per Sq. Ft.: $299
Total Cost: $21,829,747

Blue Ridge Elementary School gathering area

A new elementary school for a growing district in rural Collin County, Texas. Incorporating the sloped site into the design, the academic wing will project from the hill, providing a covered outdoor learning area below. The main corridor connects all functions of the school while providing ample amounts of natural light. Secure after-hours access to the gymnasium and cafeteria allows community use. The Cafetorium has expansive glass walls offering wide views outside. Completed Summer 2021.

Blue Ridge Elementary School playground

Education Cycles — Just as there are cycles in nature where each step in the cycle is connected to the next, so there are connections in the educational journey.

Blue Ridge Elementary School library

Each point along the path that a student follows is directly connected to the milestone before it, as well as to the next milestone to come. This path continues through every aspect of a student's education, weaving from the academic core to the arts to physical play.

Blue Ridge Elementary School gathering area

The interior design for the project depicts this path as a "ribbon" woven throughout the school building. Main destinations along the way represent different phases in the water cycle, such as precipitation, absorption through plants, and evaporation.

Blue Ridge Elementary School library

Blue Ridge Elementary School staircase

Blue Ridge Elementary School from the outside

Architect(s):

WRA Architects
Jason Oswald, AIA, Principal-in-Charge
214-750-0077

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.