How Inflation, Experience Gaps, and AI Are Reshaping Education Construction and Cost Control

Scott Creekmore, VP of Customer Engagement at Gordian, explains how Gordian evolved from Job Order Contracting into planning tools for facility condition assessments and asset recapture, plus estimating through RSMeans price data. He outlines major challenges facing education construction today: rapid inflation driven by geopolitics, an industry-wide experience gap as seasoned professionals retire without enough backfill, and resulting cost-control volatility where prices swing dramatically over short periods. Creekmore describes how advancing technology—especially AI—along with CMMS and cost-tracking software can help agencies do more with less by improving scope detail, reducing change orders, tracking labor on site, and enhancing cost benchmarking and predictive insights, including regional price differences. He also advocates for longer-term planning, economies of scale, and reexamining procurement laws and options such as cooperative purchasing and job order contracting to improve cost control.

00:00 Meet Scott and Gordian
00:22 Gordian Origins and Services
01:14 Industry Challenges Today
03:14 Tech Trends and AI Tools
05:11 AI for Better Scopes
07:42 Long Term Planning in Education
09:22 Smarter Procurement and Cost Control
10:05 Closing Thoughts

Additional resources:

Sponsored by Gordian

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.